Kuva Tower User Manual

Click on the orange hot spots in sequential order to view the assembly instructions for each component
Site Layout
1
1
Assembling the Tower Sections
4
4
6
6
Mounting the Camera
5
5
Rigging the Tower
7
7
Lifting the Tower
3
3
Tower Base
2
Ballast Block Assembly
Back to Tower

40ft tower Assembly

40ft tower Assembly
Technical Specifications
sections: 4x 10ft sections total
hardware: 7/16" & 1/2" grade 8 bolts
plates: Guy wire and camera mounting plates required
Important Warnings
- Verify all hardware before assembly
- Check section alignment
- Monitor for proper torque values
- Ensure guy wire plate orientation
Assembly Steps
1. Assemble two 20ft sections separately
2. Install guy wire plate on first section
3. Install camera mount on second section
4. Join sections using specified hardware
5. Verify all connections and alignment
Back to Tower

Ballast Block Assembly

Ballast Block Assembly
Technical Specifications
area: 16ft wide x 50ft long required
soil: 1000 PSF minimum compression strength
blocks: 123 ballast blocks total
layout: 120° spacing between assemblies
Important Warnings
- Confirm no overhead power lines or obstructions
- Site must be flat and close to level
- Tower tolerates up to 2 degrees adjustment
- Soil compression strength must meet minimum
Assembly Steps
1. Assemble two 20ft sections separately
2. Install guy wire plate on first section
3. Install camera mount on second section
4. Join sections using specified hardware
5. Verify all connections and alignment