Technical Specifications sections: 4x 10ft sections total hardware: 7/16" & 1/2" grade 8 bolts plates: Guy wire and camera mounting plates required
Important Warnings - Verify all hardware before assembly - Check section alignment - Monitor for proper torque values - Ensure guy wire plate orientation
Assembly Steps 1. Assemble two 20ft sections separately 2. Install guy wire plate on first section 3. Install camera mount on second section 4. Join sections using specified hardware 5. Verify all connections and alignment
Technical Specifications area: 16ft wide x 50ft long required soil: 1000 PSF minimum compression strength blocks: 123 ballast blocks total layout: 120° spacing between assemblies
Important Warnings - Confirm no overhead power lines or obstructions - Site must be flat and close to level - Tower tolerates up to 2 degrees adjustment - Soil compression strength must meet minimum
Assembly Steps 1. Assemble two 20ft sections separately 2. Install guy wire plate on first section 3. Install camera mount on second section 4. Join sections using specified hardware 5. Verify all connections and alignment